ELINATING UNPLANNED FLARRING CO2 REMOVAL PLANT DUE TO VOLTAGE DIPS THROUGH ADITECH INNOVATION (ANTI DIPS TECHNOLOGY) ON VACUUM PUMP CONTROL PANEL AT CO2 REMOVAL PLANT PERTAMINA EP ZONE XYZ

Ratno Tri Prima Wahyudi1, Dwi Hardi Prasetyo Ananto2, dan Aditya Bakti Priahutama3

1 Pertamina EP Subang Field, Subang, Indonesia, ratno.wahyudi@pertamina.com, dwi.ananto@pertamina.com, aditya.priahutama@pertamina.com.

ABSTRAK

Subang Field has several structures among them is the Big Bamboo Structure (BBS) where the BBS structure is the backbone that contributes 40% of the production of Subang field with a production of 1250 Bopd and 18 MMscfd. Source power at SP BBS uses PLN capacity 725 KVA and backup uses DEG (Diesel Engine Generator) Capacity 875 KVA. Obstacles to Unplanned Shutdown in the CO2 Plant Removal process (plant shutdown occurred from January 1, 2023 to August 2023) as many as 26 times with LPO 3,467 MMSCFD or equivalent to IDR 527,280,000.00 due to voltage dips in the PLN network.

Therefore, the Technology Modification of Starting Vacuum Pump CO2 Removal Using Inverter (Aditech method) was carried out in CO2 Removal SP.BBS to solve the problem of unplanned shutdown in CO2 Removal SP BBS system..

From the results of this modification, in 2024 there were 41 incidents of voltage dips from PLN's Relay Network, but they did not shut down the CO2 Removal plant, thus avoiding the LPO amounting to 5,477 MMSCFD or equivalent to IDR 831,480,000.00 and reducing emissions by 2,559 tons of CO2 Eqv which should have arisen as a result of flaring during the CO2 Removal System Shutdown.

Keywords: PLN Voltage Dips, LPO from Flarring, Dealing with Dips, CO2 Removal Plant

1.     1.  Background of the Problem

Associated Gas in SP.BBS comes from LP Well of 3 mmscfd (High Impurities CO2, Low Pressure) so that it requires a gas compressor and CO2 Removal Plant so that the gas can be sold to the open access network. When the CO2 Removal is shutdown, the gas of 3 mmscfd will be flared and there will be LPO gas sales of 0.8 mmscfd. The process sequence of shutdown and running of the CO2 Removal Plant takes 4 hours.

The vacuum pump in the BBS CO2 Removal Plant functions to vacuum the PSA Package from 15 psig to -15 psig to the Vent Stack. If there is an anomaly in the vacuum pump, it will result in the entire CO2 Removal system being shut down and gas to flarring.

2.      Problem Analysis

Like other plants at Pertamina EP which are close to the PLN high voltage network, we use electricity power source from the PLN network because more economic and more less maintenance. Most of Pertamina EP's plants are located in areas on the edge of rice fields and forests, the potential for dips is greater especially power source to SP BBS which is PLN Network has many manuver because of same grid with many industry in Karawang Area.

According to the European standard EN 50160, a voltage dip is defined as a sudden drop in the effective voltage value to a value between 90% and 1% of the specified value, followed by a direct restoration of this voltage. The duration of the voltage dip is between half a period (10 ms) and one minute. If the effective value of the voltage does not fall below 90% of the set value, this is considered normal operating status. If the voltage falls below 1% of the set value, this is considered an interruption.

Figure 3. power failure explanation

Voltage dips can lead to the failure of computer systems, PLC systems, relays, and frequency converters. In critical processes, even a single voltage dip can result in high costs, and continuous processes are particularly affected by this. And in this case the process of starting the vacuum pump motor, it uses a soft starter system where when there is a dip in the PLN power, the MCCB will trip if there is no power coming in, even if only for a split second and this will cause the vacuum pump to shut down so that the gas that should be able to flow to the vacuum pump will be blocked and a high-high alarm will appear on the suction side of the pump and the SDV will automatically open the pressurized gas to the flare line to be burned.       

Voltage Dips has recorded in the SP BBS more than 26 times a year with LPO gas flaring caused by dips which then result in plant shutdowns more thanof 3,867 MMSCFD.  PT  Pertamina EP Subang Field is committed to reducing flare gas throughout the Subang Field work area in line with ESDM Regulation Number 17 of 2021 concerning the Implementation of Flare Gas Management in Oil and Gas Business Activities.             

3.      DiscusionSolution  Problem Solven

There are 3 alternative solutions being studied to overcome the problem of voltage dips at SP BBS Subang Field. The 3 alternatives are using static UPS, DRUPS, and the Aditech method.

Figure 4. Table comparison of 3 alternatives

Based on the comparison of costs, time and operations, it was concluded that using the Aditech method had the most positive results, so this alternative was chosen.

On the selected solution, we designed the VSD installation as a replacement for the soft starter by using a series that has a capacitor so that it can store current to withstand motor torque when dips occur.

Figure 5. MCC CO2 Removal SP.BBS Electrical Circuit

 

4.      The following working principle of the Aditech method

Design and selection  the VSD module  installation as a replacement for the soft starter in the SP BBS CO2 Removal system by using a series that has a DC capacitor as DC Link Bus so that it can store current to maintain the voltage to the electric motor vacuum pump when a power failure or voltage dips occur.

If the inverter brakes the motor, the kinetic energy of mechanical load is converted to electric energy to be transmitted into the inverter circuit. This regenerative energy is often consumed in so-called braking resistors as heat.

An ACR (AC Reactor or Inverter ) is effectively used when the power supply is unstabilized (excessive interphase voltage unbalance) or in DC link bus operation (shared PN operation) requiring stable DC power. It is also used for power supply matching and for correction of voltage waveform and input power factor.

Figure 6. Voltage wave form correction when capacitor is applied

The inverter recognizes a momentary power failure upon detecting the condition that DC link bus voltage goes below the undervoltage level, while the inverter is running. If the load of the motor is light and the duration of the momentary power failure is extremely short, the voltage drop may not be great enough for a momentary power failure to be recognized, and the motor may continue to run uninterrupted. Upon recognizing a momentary power failure, the inverter enters the restart mode (after a recovery from momentary power failure) and prepares for restart. When power is restored, the inverter goes through an initial charging stage and enters the ready-to-run state. When a momentary power failure occurs, the power supply voltage for external circuits such as relay sequence circuits may also drop so as to turn the run command OFF.

Figure 7. inverter working process when power failure

 

Based on the study of the Aditech methode, it was decided to design and install an inverter with a type that has a DC capacitor with a wiring diagram as below.

 

Figure 8. conncetion example residual current protection device

 

5.      Installation Process

And here is the flowchart for installing the ADITECH method:

Starting from studying related to single line diagram SP BBS, wiring diagram MCC and CO2 Removal control panel unplanned shutdown simulation is done to find out the main cause of CO2 Plant unplanned shutdown followed by designing the aditech method then the procurement process. After the material arrives, the installation and commissioning process, monitoring results and standardization are continued.

 

Figure 9. Flowchart Modifikasi ADITECH

 

    

Figure 10. Before Intalation                                         figure 11. After Instalation

6.      Result

Figur 12. Grafik Frekuensi shutdown CO2 Removal sebelum dan sesudah pemasangan ADITECH

From the results graph above, it can be seen that before the ADITECH technology was installed, the CO2 Removal Plant shutdown always occurred when there was a PLN voltage dip, but after the ADITECH technology was installed, when the PLN voltage dip occurred, it would not cause the CO2 Removal system shutdown at SP BBS.

It can be concluded that since the installation of ADITECH technology on the CO2 Removal vacuum pump, the frequency of plant shutdowns due to PLN voltage dips can be eliminated.

Since Instalation in 2024 there were 41 incidents of voltage dips from PLN's Relay Network, but they did not shut down the CO2 Removal plant, thus avoiding the LPO amounting to 5,477 MMSCFD or equivalent to IDR 831,480,000.00 and reducing emissions by 2,559 tons of CO2 Eqv which should have arisen as a result of flaring during the CO2 Removal System Shutdown.

7.      Thank you and Support

Thank you to Mr. Ndirga Andri Sisworo, Mr. Emond Winarto, Mr. Eko Tri Wahyudi, for their support and direction so that this journal and innovation can be completed and become an alternative solution option for solving the PLN Dips problem at SP BBS in particular and hopefully can be used elsewhere at PT Pertamina EP in general. Thank you to the entire Subang Hebat Team for their cooperation in completing the Aditech innovation on the vacuum pump control panel at the SP BBS CO2 Removal Plant.

8.       DAFTAR PUSTAKA

·       International Standard IEC 61000-4-30 : Testing and measurement techniques – Power quality measurement methods.

·       International Standard IEC 60038 : IEC standard voltages, defines a set of standard voltages for use in low voltage and high voltage AC and DC electricity supply systems.

·       International IEEE Standard 1159-1995  : Recommended Practice for Monitoring Electric Power Quality

·       European Standard EN 50160 – Voltage Characteristics of Public Distribution Systems

·       Ian K.P. Ross, MIEE, VOLTAGE SAGS AN EXPLANATION CAUSES, EFFECTS AND CORRECTION, https://www.janitza.com/knowledge-database/voltage-dips-and-interruptions.html , 2023.

·       Fuji electric inverter frenic installation dan manual shop.

·       https://www.ashleyedison.com/2021/12/30/top-5-solutions-to-solve-voltage-drops/

·       Freeman Chiranga, Lesedi Masisi, Variable Speed Drive DC-Bus Voltage Dip Proofing, School of Electrical and Information Engineering, University of the Witwatersrand, Johannesburg, 2000.

9.   9. ABOUT THE AUTHOR

Ratno Tri Prima Wahyudi, born in Lumajang, March 25, 1987. Educational background: He has taken Diploma 3 in Mechanical Engineering at the Malang State Polytechnic, then continued bachelor degree in the Department of Mechanical Engineering at Mercubuana University. Currently a professional career as a Senior Supervisor of Production BBS & CCH at PT. Pertamina EP Subang Field, Regional 2 Zone 7. Total experience of 16 years in Oil & Gas Company.

Dwi Hardi Prasetyo Ananto, born in Ngawi on August 9, 1976. With a background in Field Mechanical Engineering from Akamigas Cepu and S1 Management, Experience working in the world of Oil and Gas mechanics since 1994 in Onshore and Offshore maintenance Gas Ccmpressor, Genset, Pump, Crane, Gas Turbine Generaor, Hottaping and other blogs. Oil and Gas Industry Mechanic.

Aditya Bakti, born in Magelang, October 29, 1988. Background of Strong Current Electrical Engineering Education, Diponegoro University, Semarang. After being unfortunate in various work locations, PT Pertamina EP is currently in the OSF Zone 7 engineering section of PT Pertamina EP. Total experience 11 years in Oil & Gas Company.

Postingan Populer

Kunci Inch dengan Kunci mm Dalam Dunia Mechanic

  Jika kita bekerja sebagai mechanic, toolkit adalah senjata kita dalam menyeleseikan suatu pekerjaan. karena dengan kelengkapan toolkit menurut saya 45% pekerjaan / troubleshoot dapat terpecahkan. Dan sebagai mekanik kita kadang menemukan ukuran bolt / nut yang berbeda - beda, ada ukuran dalam inchi, ada pula yang dalam ukuran mili meter. Seandainya kita paksakan mengunakan ukuran kunci tertentu, jutru tidak akan menyeleseikan masalah, tetapi malah menambah pekerjaan lainnya karena bolt atau nut yang kan kita kendorin akan slek atau rusak sehingga semakin sulit unitiuk kita lepaskan. atau bakan kunci yang kita gunakan akan rusak, dan hal ini elain menyusahkan waktu kita kerja juga akan menyusahkan di lain hari karena kita harus membeli kunci baru yang tidak murah harganya. Baca juga : Kehidupan di Offshore Platform  Fungsi Air Dryer Pada Air Compressor Korelasi Komposisi Gas dengan Air Fuel Ratio Perbedaan Prosedure Pembelian Gas Engine Dan Diesel Engine ...

Teory Pompa Kerja Pararel dan Pompa Kerja Seri

Pompa dapat kita pasang atau operasikan pararel atau seri, jika kita ingin menaikan qapasitas, pompa akan kita operasikan Pararel, dengan syarat Head pompa sama. Sedangkan jika kita ingin meanikan Head/ tekanan discharger pompa, kita dapat mengoperasikannya secara seri dan syartnya pompa ke 2 harus lebih rendah qapasitasnya, sebab jika sama maka akan ada kapitasi. Pompa pertama kita sebut pompa pengirim atau pompa utama, sementara pompa ke 2 kita sebut sebagi pompa Booster atau pompa peningkat tekanan. Dalam mendesain (pararel/series) pompa, jumlah 2 atau lebih pompa sentrifugal disebut dengan multiple centrifugal pump. Dalam mendesain multiple centrifugal pump ini utamanya adalah ketika melakukan instalasi,  sangatlah penting untuk memperhatikan hubungan antara kurva pompa (pump curve) dan kurva sistem perpipaan. (piping system curve). Efek dari menambahkan 2 buah pompa yang identik dalam rangkaian paralel dapat di lihat pada gambar grafik di bawah ini. Baca ...

Cara Leak Test (test kebocoran) dan Hydrotest pada Valve dan Bejana Tekan

Leak Test : Biasanya ini dilakukan pada reinforcing pad of opening, menggunakan udara. Kadang-kadang di-counter check dengan bubble soap. Sehingga sering disebut juga bubble test. Diaplikasikan pada semua peralatan yang mempunyai pads pada bagian pressure (PV, HE, Tank, dll). Bisa juga leak test dilakukan tanpa sabun. Material diinjeksi dengan udara bertekanan dan direndam dalam tanki air untuk beberapa waktu (digunakan dalam pengetesan fuel tank untuk forklift). Ini lebih efektif dibandingkan dengan sabun. Test ini juga dilakukan untuk pengecekan kebocaran pada blinded flange, flange joint (shell side to tube side joint), channel cover installation, dsb. Secara internal, diberi tekanan menggunakan udara – alternatif lain bisa menggunakan nitrogen (N 2 ). Pada tangki ada juga istilah leak test untuk roof dan bottom installation. Alatnya disebut Vacuum Box. Leak test tidak sama persis dengan pneumatic test. Pneumatic test itu bisa digunakan sebagai pengganti hydrotes...