Skip to main content

Posts

Showing posts with the label contoh paper

Paper Dhevils Mechanic Terkait penyeleseian Dips PLN

ELINATING UNPLANNED FLARRING CO2 REMOVAL PLANT DUE TO VOLTAGE DIPS THROUGH ADITECH INNOVATION (ANTI DIPS TECHNOLOGY) ON VACUUM PUMP CONTROL PANEL AT CO2 REMOVAL PLANT PERTAMINA EP ZONE XYZ Ratno Tri Prima Wahyudi 1 , Dwi Hardi Prasetyo Ananto 2 , dan Aditya Bakti Priahutama 3 1 Pertamina EP Subang Field, Subang, Indonesia, ratno.wahyudi@pertamina .com , dwi.ananto@pertamina.com , aditya.priahutama@pertamina .com . ABSTRAK Subang Field has several structures among them is the Big Bamboo Structure (BBS) where the BBS structure is the backbone that contributes 40% of the production of Subang field with a production of 1250 Bopd and 18 MMscfd. Source power at SP BBS uses PLN capacity 725 KVA and backup uses DEG (Diesel Engine Generator) Capacity 875 KVA. Obstacles to Unplanned Shutdown in the CO2 Plant Removal process (plant shutdown occurred from January 1, 2023 to August 2023) as many as 26 times with LPO 3,467 MMSCFD or equivalent to IDR 527,280,000.00 due to voltage dips in th...